Gift Cards are available for that Special Event or Person!
www.rancherscustombutchering.com
Call us to make an order
or schedule a
farm butcher today
BEEF • HOG • LAMB
We Welcome
Custom
Orders
Open
Mon-Fri
9am-5pm
MEAT PROCESSING SERVICES
-Mobile Slaughter
-Custom Butchering
-Wild Game Processing
-Sausage and Smoked Meat
products made in house
We Accept Major
Credit Cards, Debit Card
We are a FULL Service BUTCHER SHOP
and so much more....
890 Marguerite Avenue, Corning CA
(530) 824-MEAT (6328)
(530)-824-4328 FAX
QUALITY RETAIL MEATS
-Butcher Boxes Made to Order
-Marinaded & Seasoned Meats
-Pork Sausage Brats
-Wholesale & Retail
Cuts Available
May 2022 , TEHAMA - THE MAGAZINE 11
Adobe bricks dry in the sun, and are
not fired in kilns like red bricks. The
adobe brick makers made more than
150 bricks for this reconstruction. The
finished bricks were laid flat for a few
days to begin drying.
The adobe bricks were turned
on their sides and dried for 30 days
before they were ready to use.
The tops of the adobe walls were
badly damaged and all of them
needed new bricks. Broken bricks
and debris were removed before new
bricks were placed.
After the walls were repaired, the
temporary roof was removed.
If the adobe bricks are not covered,
they will fall apart with exposure to
rain. They can turn back into mud.
Lime plaster was used to cover and
protect the adobe bricks. Without
support, the lime plaster will not stay
on the adobe walls. A non-chicken
wire solution was used where small,
hard volcanic rocks were plastered
into the adobe on all walls to create
ledges to support the plaster.
Notches were carved on the
exterior walls. A rock was placed in